Things tagged 'consultation'

limited to the area of Westminster Cycling Campaign:

76 issues found for 'consultation':

  • Pre-submission consultation (Regulation 14) on Knightsbridge Neighbourhood Plan

    Created by Simon Munk // 1 thread

    Knightsbridge forum description:

    The Knightsbridge Neighbourhood Forum is inviting views on its proposals for a neighbourhood development plan and associated documents.

    This is a pre-submission consultation in accordance with the requirements of the Localism Act 2011 and Regulation 14 of the Neighbourhood Planning (General) Regulations 2015 (as amended).

    The consultation documents may be found at the link below on the Knightsbridge Neighbourhood Forum’s website:

    Part One: Knightsbridge Neighbourhood Plan, 2017-2036 (4.7MB)
    Part Two: Knightsbridge Management Plan – proposed actions that are not planning policies (2.9MB)
    Part Three: Knightsbridge Evidence Base – comprising supporting evidence for Part One (15.7MB)
    Executive Summary (3.0MB)
    Hyde Park Barracks - Preliminary healthcheck note by Christopher Lockhart-Mummery QC (3.0MB)
    Further evidence and related information (see link below)
    Letter to consultees dated 8 December 2016 (0.6MB)
    http://www.knightsbridgeforum.org/planning/consultation/

    Please sign in to vote.
  • Quietway 19 - Cambridge Circus

    Created by Colin Wing // 4 threads

    There has never been a satisfactory cycle route from Soho into Covent Garden. The right turn from Old Compton Street into Charing Cross Road is prohibited. Moor Street lands cyclists at an inconvenient part of the junction. Using Greek Street and Shaftesbury Avenue means a difficult right turn into Charing Cross Road.

    In April 2015 Westminster's contractors are consulting the public about improvements to Cambridge Circus. The consultation period ends on 8th May 2015. Subject to approvals, it is planned to start the works on site in August 2015 and to be completed by February 2016.

    The scheme takes into account the need for Quietway 19 to pass through the junction between Soho and Covent Garden.

    Please sign in to vote.
  • Carton Vale proposed cycling and pedestrian improvements

    Created by David Arditti // 1 thread

    The consultation on this is now out: see http://brent-consult.objective.co.uk/portal/ens/carlton_vale_walking__cycling_improvements

    This is a scheme for which Brent Cyclists has been campaigning for some years. See also here for campaign context
    http://www.brentcyclists.org.uk/content/campaign-success-brent-plans-its-first-road-segregated-cycle-route

    While this scheme does not do all we would like here it is a major step forward for the borough, which has no effective cycle infrastructure to speak of and lags behind adjacent LAs in cycling. Hence we would like to see it go through.

    Please sign in to vote.
  • Consultation on St Mark’s Square Proposed Pedestrian and Cycling Improvements

    Created by Jean Dollimore // 1 thread

    This consultation offers very-long-campaigned for two-way cycling in St Marks Square to complete the 6-year old scheme in Princess Road.

    Camden proposes to take out one of the three motor traffic lanes and replace it with a northbound contraflow cycle lane. The parking will be moved from the west side of the road and replaced as a floating parking bay outside the contraflow cycle lane – with a buffer to separate the cars from the cycle lane.

    They also propose a right turn pocket on Prince Albert Road to facilitate right turns into the contraflow cycle lane.

    For pedestrians, Camden proposes an extra green-man crossing so that there will be one on each of the three arms.

    Please sign in to vote.
  • Earlham Street West – proposed public realm improvements

    Created by Jean Dollimore // 1 thread

    Earlham Street runs one way westbound between Seven Dials and Shaftesbury Avenue.

    In 2014, Earlham Street was closed to motor vehicles at the junction with Shaftesbury Avenue.

    The stated objective include the following:

    - create a safer and more attractive connection for pedestrians and cyclists to neighbouring areas, especially Soho and St Giles

    The proposed changes include the following:

    - between Shaftesbury Avenue and Tower Street, the entire road width at footway level with dropped kerbs to allow a cycle connection to Shaftesbury. They don’t say whether the existing bollards will remain in place.

    - between Tower Street and Seven Dials, narrow the road from 6.5 to 3m, move parking to other side of Seven Dials, widen footways.
    - market stalls on south side of street with loading before and after trading times

    Please sign in to vote.
  • Cycle Superhighway 11 in Westminster and Camden

    Created by Colin Wing // 7 threads

    This is part of a proposed cycle superhighway from the Finchley Road into Central London.
    It will become more attractive after the modification of the Swiss Cottage gyratory system in Camden.
    See the discussion threads for details on the sections in Westminster, Camden and Swiss Cottage

    Please sign in to vote.
  • Vauxhall Cross public consultation

    Created by Simon Munk // 2 threads

    TfL say:
    We are proposing a number of transformational changes to Vauxhall Cross as part of our Road Modernisation Plan.
    The Road Modernisation Plan is the biggest investment in London’s roads for a generation, consisting of hundreds of projects to transform junctions, bridges, tunnels and pedestrian areas, making our roads safer and more reliable.
    Working closely with the Lambeth Council, we are aiming to return the one-way road system at Vauxhall to two-way roads and significantly improve pedestrian and cyclist provision to help create a safer and less intimidating environment for vulnerable road users. The proposed changes would also help to improve connectivity throughout the area, and create a better environment for people living, working, and travelling through Vauxhall.
    Following our initial consultation in 2014 on our high level proposals, we are now inviting your views on our detailed design proposals.

    What are we proposing?
    The changes we are proposing include:
    Removing the existing one way road system around the transport interchange (Parry Street, Wandsworth Road, Kennington Lane, South Lambeth Road) by converting these roads around Vauxhall to two way
    Providing more cycle and pedestrian crossings as well as segregated lanes and parking for cyclists
    Improving existing and providing new public spaces
    Redesigning the transport interchange, including a new central bus station

    Why are we proposing this?
    Reducing traffic dominance
    The current gyratory creates an environment heavily dominated by motor vehicles. The wide carriageway encourages high speeds, especially outside peak periods
    The gyratory can be difficult to navigate, and the one-way arrangement means that vehicles often follow indirect routes
    Lack of facilities for pedestrians and cyclists
    Large numbers of pedestrians pass through Vauxhall each day but the existing crossings do not always follow the most direct or popular routes, which can lead to pedestrians crossing roads away from the crossings
    The Vauxhall gyratory has some of the highest numbers of collisions involving injury to pedestrians and cyclists in London
    Cycle Superhighway 5 will improve conditions for cycling along Harleyford Road and Kennington Lane. However, there is limited cycle provision on the other roads surrounding Vauxhall Cross and a lack of connectivity between facilities
    Supporting the transformation of Vauxhall
    Vauxhall is the gateway to one of Europe’s largest regeneration zones, with 25,000 new jobs and 20,000 new homes coming to the Vauxhall, Nine Elms and Battersea area
    Supporting Vauxhall’s distinct local character, the proposals look to the future – preparing for the increase in the numbers of people living, working, and visiting Vauxhall and its existing and new shops, businesses and attractions

    Please sign in to vote.
  • West End Project consultation

    Created by Jean Dollimore // 6 threads

    This scheme proposes to restore two way working in Tottenham Court Road (TCR) and in the Gower Street alignment which includes Bloomsbury Street and Shaftesbury Avenue. All the bus routes will be on TCR.

    The consultation is on Camden's website at:

    http://www.wearecamden.org/westendproject/

    In TCR, Camden proposes a "bus and cycle street" from 8 am to 7pm (Monday to Saturday) with local access for cars, taxis and loading on short sections of Tottenham Court Road via side roads.

    TCR will have a pair of 4.5m wide carriageways to be shared by cycles and buses (90 buses per hour in each direction) and by the additional local traffic.

    In the Gower Street alignment, Camden proposes two-way access for private motor vehicles (no buses) and that these roads will have a pair of 4.5m wide carriageways, each including a lightly segregated 1.5m wide cycle track.

    Other measures proposed:
    - in both TCR and the Gower Street alignment Camden proposes raised sections of road to reduce motor speeds
    - two-way cycling in all the side streets (except for Maple Street, University Street and Howland Street)
    - new public spaces including a new park on Alfred Place and a ladder of calm side streets.

    These changes to roads and to cycle permeability are shown in the diagram at:
    http://www.wearecamden.org/westendproject/assets/images/cycling-plan-resized

    Details of the road layout for TCR are at:
    http://www.wearecamden.org/westendproject/assets/images/tcr-north-resized
    and
    http://www.wearecamden.org/westendproject/assets/images/tcr-south-resized

    Details of the road layout for the Gower Street alignment are at:
    http://www.wearecamden.org/westendproject/assets/images/gower-street-north-resized
    and
    http://www.wearecamden.org/westendproject/assets/images/gower-street-south-resized

    Exhibitions are to be held at the Building Centre, Store Street on 19th June (10 am to 5pm) and 7th July (5pm to 8pm),

    Camden Cyclists are holding a public meeting for cyclists to discuss this project.
    On 30th June 7pm - 9pm
    at the YMCA Indian Student Hostel, 41 Fitzroy Square, London, W1T 6AQ.

    We will finalise our response to the consultation early in July.

    The public consultation will run until Friday 18 July 2014.

    Please sign in to vote.
  • East-West Cycle Superhighway - phase 2 consultation

    Created by Rosie Downes // 11 threads

    TfL are consulting on plans for the East-West cycle superhighway in Hyde Park and St James's Park. The proposals can be seen at https://consultations.tfl.gov.uk/cycling/eastwest?cid=cycle-east-west

    The LCC office has set up this thread to facilitate discussion in advance of submitting its response to the consultation. The consultation closes on 29th March.

    To ensure that your comments will be taken into account when composing LCC’s response please make sure that your registered identity on Cyclescape includes your full name and whether you are a member of LCC and any local LCC group. (You can add these details by clicking on your name at the top of the page and then the Edit Profile tab.)

    Please sign in to vote.
  • TfL Consultation on Finchley Road - Boundary Road

    Created by Jean Dollimore // 1 thread

    TfL proposes some changes related to the QuietWay "Gladstone Park to Regents Park, see map

    https://www.google.com/maps/d/viewer?mid=zWlxfK2Ffon4.kSz3KHcSLaXQ

    Their proposals

    Finchley Road
    ============

    1. Ban the left turn for all northbound traffic (motor vehicles and cycles) from Finchley Road into Boundary Road. (Note "And Cycles"!)

    2. Extend the northbound bus lane on Finchley Road

    3. Changes to traffic islands to provide extra space and protection for cyclists travelling east-west along Boundary Road and crossing Finchley Road, as well as providing an improved waiting area for southbound cyclists turning right into Boundary Road from Finchley Road

    4. A new 5-metre part-width Advanced Stop Line (ASL) with early release (a few seconds) on Finchley Road for cyclists travelling southbound.

    5. Widen the existing pedestrian crossing to 3.2 metres on the southern arm of the Finchley Road junction

    6. Enlarge the footway on the south-west corner of the junction,

    Boundary Road
    ============

    7. A new 3.2 metre wide signal controlled pedestrian crossing on the western arm of Boundary Road

    8. Relocate and resize traffic islands to improve cyclists’ comfort

    9. Widen the existing pedestrian crossing to 3.2 metres on the eastern arm of Boundary Road

    10. Widen the central cycle feeder lane on the western arm of Boundary Road

    11. Replace speed cushions with a ‘sinusoidal’ speed hump across the full width of the carriageway on the west arm of Boundary Road

    12. New cyclist detection system on Boundary Road, meaning cyclists no longer have to use a push button to activate the traffic signals to cross or access Finchley Road

    See the consultation at:

    https://consultations.tfl.gov.uk/cycling/finchley-road-boundary-road
    ======

    Reply by 27th September 2015.
    To consultations@tfl.gov.uk

    Please sign in to vote.
  • Westminster Bridge South

    Created by Simon Munk // 1 thread

    TfL say:

    "The improvements would provide a connection between the East-West Cycle Superhighway on the north bank of the Thames and the Central London Cycling Grid on Belvedere Road and Royal Street in Lambeth, providing a joined-up cycling network for this part of London."

    "Proposed layout changes for cyclists
    Provide cyclists with dedicated road space on Westminster Bridge, Westminster Bridge Road, Lambeth Palace Road, Addington Street and York Road; cyclists would be separated from traffic by a kerb or white line
    Separate cyclists and motor vehicle movements at junctions; cyclists would have their own traffic signals which would operate at different times to those for other traffic
    Widen the pedestrian/cycle crossing by the south end of Belvedere Road and improve the connection between Belvedere Road and Westminster Bridge Road
    Convert the pedestrian crossing on Lambeth Palace Road outside the hospital to a pedestrian/cycle crossing so that cyclists can access Royal Street from Lambeth Palace Road. The crossing would be changed from ‘staggered’ (two separate crossings with an island in the middle) to ‘straight across’ (a single crossing)
    Provide bus stop bypasses at bus stops D and E on Westminster Bridge Road, bus stops B and C on Lambeth Palace Road and the tour bus stop at the east side of Westminster Bridge so that cyclists could avoid having to mix with traffic. Cyclists would continue behind the bus stops on a carriageway-level cycle track, which would feature a chicane and narrowed track to reduce speeds. Bus passengers would access the bus stop waiting area by crossing the cycle track using a marked crossing point/s
    Widen the footway on the corner of York Road and Westminster Bridge Road to slow down left turning vehicles
    Cyclists would still be able to use the northbound bus and cyclist only route from Westminster Bridge Road to York Road"

    "Cycle facilities on Westminster Bridge
    "Westminster Bridge is a grade two listed structure and a busy bus, cycling and pedestrian route. We would like to know what you think about how cycle facilities should be provided on Westminster Bridge. We are proposing two options:
    a. 2.3m wide mandatory cycle lane in both directions
    This approach would give cyclists more space to overtake one another. A painted white line would separate cycles and motor vehicles, but there would be no physical segregation. Motor vehicles would be prohibited from entering the cycle lane.
    b. 1.8m wide segrgated cycle track in both directions
    This approach would provide cyclists with physical separation from motor vehicles using a 0.5m wide traffic island, but may reduce cyclists’ opportunity to overtake one another."

    Please sign in to vote.
  • Buckingham Palace - Spur Road

    Created by Colin Wing // 1 thread

    Spur Road and the road in front of Buckingham Palace form a section of the East-West Cycle Superhighway between Constitution Hill and Birdcage Walk.

    The plans that Transport for London presented to the public for consultation in February-March 2015 failed to include any specific proposals for this section. Following successful campaigning by cyclists, TfL published proposals on 20th August 2015 for consultation up till 4th October 2015.

    Please sign in to vote.

532 threads found for 'consultation':

No planning applications found for 'consultation'.

Back to top