Roadworks: Gower Street
Resurfacing works on Gower Street from 24th Feb to 26th April.
limited to the area of Westminster Cycling Campaign:
2 issues found for 'wep':
Created by John Chamberlain // 1 thread
Resurfacing works on Gower Street from 24th Feb to 26th April.
Created by Jean Dollimore // 6 threads
This scheme proposes to restore two way working in Tottenham Court Road (TCR) and in the Gower Street alignment which includes Bloomsbury Street and Shaftesbury Avenue. All the bus routes will be on TCR.
The consultation is on Camden's website at:
http://www.wearecamden.org/westendproject/
In TCR, Camden proposes a "bus and cycle street" from 8 am to 7pm (Monday to Saturday) with local access for cars, taxis and loading on short sections of Tottenham Court Road via side roads.
TCR will have a pair of 4.5m wide carriageways to be shared by cycles and buses (90 buses per hour in each direction) and by the additional local traffic.
In the Gower Street alignment, Camden proposes two-way access for private motor vehicles (no buses) and that these roads will have a pair of 4.5m wide carriageways, each including a lightly segregated 1.5m wide cycle track.
Other measures proposed:
- in both TCR and the Gower Street alignment Camden proposes raised sections of road to reduce motor speeds
- two-way cycling in all the side streets (except for Maple Street, University Street and Howland Street)
- new public spaces including a new park on Alfred Place and a ladder of calm side streets.
These changes to roads and to cycle permeability are shown in the diagram at:
http://www.wearecamden.org/westendproject/assets/images/cycling-plan-resized
Details of the road layout for TCR are at:
http://www.wearecamden.org/westendproject/assets/images/tcr-north-resized
and
http://www.wearecamden.org/westendproject/assets/images/tcr-south-resized
Details of the road layout for the Gower Street alignment are at:
http://www.wearecamden.org/westendproject/assets/images/gower-street-north-resized
and
http://www.wearecamden.org/westendproject/assets/images/gower-street-south-resized
Exhibitions are to be held at the Building Centre, Store Street on 19th June (10 am to 5pm) and 7th July (5pm to 8pm),
Camden Cyclists are holding a public meeting for cyclists to discuss this project.
On 30th June 7pm - 9pm
at the YMCA Indian Student Hostel, 41 Fitzroy Square, London, W1T 6AQ.
We will finalise our response to the consultation early in July.
The public consultation will run until Friday 18 July 2014.
8 threads found for 'wep':
A discussion on issue
West End Project consultation
linus
posted
A discussion on issue
Roadworks: Gower Street
John Chamberlain
posted
Camden Cyclists
A discussion on issue
Roadworks: Gower Street
John Chamberlain
posted
A discussion on issue
West End Project consultation
linus
posted
A discussion on issue
West End Project consultation
Jean Dollimore
posted
Camden Cyclists
A discussion on issue
West End Project consultation
Dominic Fee
posted
Camden Cyclists
A discussion on issue
West End Project consultation
George Coulouris
posted
Camden Cyclists
A discussion on issue
West End Project consultation
Jean Dollimore
posted
No library items found for 'wep'.
No planning applications found for 'wep'.